OPERATING PERFORMANCE


1. ORGANISATION

Organization is headed by Sr. DOM. He is assisted by DOM (G), DOM, AOM (Chg.), AOM (M) & AOM (Planning). Two officers are in the field - AO/MFP & AO/BJU.


BIRENDRA KUMAR

Sr. DOM


Vacant                                RUPESH KUMAR
              DOM (G)                                     DOM

I.B.Prasad            Vacant             Vacant               J.P.Trivedi         S.M.Sharma
  AOM(C)             AOM (M)         AOM (Plg.)             AO/MFP              AO/BJU

One post of DOM (G) and two posts of AOM are vacant in this Division in which post of DOM (G) since 10.05.11, post of AOM (Plg) since last two years Monitoring of operational work is suffering.

2. INTRODUCTION:

Sonpur Division’s Chhapra – Katihar section (327 Kms) is main artery to feed N. F. Region. On this section we still have single line to the extent of 50%. The Division has 07 interchange points. In Up direction, trains are received at Katihar interchange point (N. F. Railway) and made over to Chhapra interchange point of Varanasi Division (N. E. Railway) covering  a direct distance of 327 Kms and MFP, SPJ, MNE & KGG are interchange points for Samastipur Division; whereas, SAE is for Danapur Division. In Down direction movement are vice-versa, trains are taken over at Chhapra & Muzaffarpur points and made over to Katihar Division. Almost 80% of goods trains travel on Katihar – Barauni – Sahpur patoree – Sonpur – Chapra route which in a way is chord line of the Division.


3. GENERAL INFORMATION:

Type of Station

No. of Stations 

Crossing Station:

60 (Excluding Samastipur)     

Flag:  

02    

Halt:   

26

Total:

88 (Excluding Samastipur)

Classification of Station in Sonpur Division:

Type of Station

Stations

Group ‘A1’  - 01

MFP

Group ‘A’    - 03

HJP, BJU & KGG

Group ‘B’    - 04

BGS, MNE, NNA & SEE

Group ‘C’   -   --

---

Group ‘D’   - 15

DSS, SPP, MSK, DGA, SMO, BCA, DOL, THB, MOG, DES, CRR, KUE, GRL, BNR & MNO

Group ‘E’   - 37

KRBP, LKN, NNR, PSR, DUBH, VPN, STLR, AYRN, UJP, TGA, NAZJ, SDG, SKJ, SLT, SIHO, KTRH, NYO, KHQ, KPGM, SAI, GJH, CSR, RD, GAI, KHI, STJT, NRPA, BKRH, TUR, BAGL, LAK, TIL, SAE, DPL, UMNR, CKRD & PMU

No of Trains running in Sonpur Division:

Trains

Total Trains

Daily

Non-Daily

Mail/Express

101

56

45

Passenger

70

60

10

Total:

171

116

55



Type of Trains

Number 

MR Trains:

21     

Mail/Express Trains

80  

Passenger Trains:  

70

Total:

171

Number of Trains Originate/Terminate:

To/ From Station

Number (in pairs)

Mail/Express

Passenger

Barauni:

06

10

Muzaffarpur:

19

06

Hajipur:

01

04

Sonpur:

00

09

Total:

27

29

Rake Loading/Unloading Facilities in Sonpur Division:

Loading

Unloading

Full Rake

SAI, NRPA, KPGM, BJU, IORF/BJU, GHZ Dump, BGS, KGG, MNE, NNA & SMO

SAI, TPS/Kanti, NRPA, KPGM, IORG/BJU, GHZ Dump, BTPS/SAE, BGS, KGG, MNE, NNA & SMO

Half Rake

KUE

         

Private Sidings

i)Kanti Thermal Power Station, Muzaffarpur

ii)Bharat Wagon Engineering Limited, Muzaffarpur

iii)Bharat Petroleum Siding, Narayanpur Anant

iv)FCI Siding at Narayanpur Anant

v)Barauni Thermal Power Station, Barauni

vi)Indian Oil Corporation, Barauni

Engineering Siding

i)PSC Sleeper Siding at Sarai

 4. PERFORMANCE IN GENERAL- MAJOR ACHIEVEMENT:

 

Sonpur is the first Division in E. C. Railway where 100% booking of Guards is being done by CMS in Sonpur Division. Now the 100% Mileage bills is generated through the system and all manual working is stopped & manual register for “Sign on/sign off” availability of running staff is totally stopped from the lobbies.

4.1 PUNCTUALITY:

A)After the installation of COIS, best ever Mail/Exp. punctuality figure of 95% on 13.02.2013 is achieved. The previous best ever punctuality figure was 94% on 07.09.2012.

B)Due to hard work being done by all the officials round the clock,punctuality of Mail/Express trains has improved during the current year. Figure is as follows:

 

Month

2011-12

2012-13

Improvement

April

60.4

71.5

+ 11.1

May

55.6

64.7

+ 09.1

June

47.1

63.6

+ 16.5

July

60.0

59.1

- 00.9

August

74.8

76.5 + 01.7

September

74.9

76.8 + 01.9

October

77.2

74.5 - 02.7

November

73.1

76.2 + 03.1

December

67.4

59.9 - 07.5

January

72.5

69.7 

- 02.8 

February

74.7

81.4 

+ 06.7 

March

68.2

 

 

 

           Cumulative Punctuality Performance: 

 

 

2011-12 (Up to Feb.)

2012-13 (Up to Feb.)

Variation

a)

Mail/Express

 

 

 

i)

MR Trains

63.8

68.0

+ 04.2

ii)

Excld. MR Trains

69.0

81.6

+ 12.6

iii)

Incld.MR Trains

67.1

70.3

+ 03.2

 

There are some operational constraints which affect punctuality also which need to early completion:

a)   Early completion of 2nd bridge between SEE – HJP is required.

b)   Early Completion of Patch Doubling of remaining station of BJU – KIR section i.e. GAI - NNR & KTRH - CRR is required.

c)  Raising of speed of north line between SAE - BJU from 50 KMPH to 100 KMPH may be completed on priority.

d)   Some sectional speed constraints hamper the line capacity utilization of section and reduce the utilization of engine as well as affect the punctuality. Also the larger sections of this division are still left for the relaxation of speed on turnout/loop line.

4.2 Freight Loading Performance and action plan to achieve the target for the year 2012-13:

(A)Loading in terms of 08-Wh. (Up to Feb.) 

Commodity

Target

Actual

% Variation

 

2011-12

2011-12

2012-13

Last Year

Target

POL

---

23668

26885

+ 13.6

---

Others

---

9881

15211

+ 53.9

---

Total

---

33549

42096

+ 25.5

---

 

(B)Loading in term of MT (Up to Feb.) 

Commodity

Target

Actual

% Variation

 

2011-12

2011-12

2012-13

Last Year

Target

POL

---

1.220

1.379

+ 13.0

---

Others

---

0.616

0.943

+ 53.1

---

Total

---

1.836

2.322

+ 26.5

---

 New Thrust Areas:

a) One additional goods terminal nearby NRPA is urgently required to minimise the     congestion at NRPA.

b) Full length DD line is required at KUE, SMO station to increase the Maize loading   of this division. 

4.3 Maintenance Blocks:

There is an acute problem in granting traffic Block on single line section. However total 5900 hours (up to Feb.) block were provided which is 03.7% Higher than those in the previous year. Last year 5690 (up to Feb.) hours block was provided.

Up to Feb. (in hrs.)

% variation

2011-12

2012-13

Maintenance Block (In Hrs.)

5690

5900 + 3.7

4.4 Station Working Rule:

Position of SWR

Number

Only in English:

   01     

Bilingual:      

60  

Total:

*    It includes GHZ

61*

                                   

4.5 Installation of FOIS/TMS/ICMS:

i)FOIS (Freight Operations Information System) which includes RMS (Rake Management System)/ TMS (Terminal Management System) is installed at SEE Control, SAI, NRPA, KPGM, BJU, IORG siding/ BJU, BGS, KGG & MNE. All the installed RMS/TMS are in working condition.

ii)Sonpur Division has already started doing 100% feeding in punctuality module of Integrated Coaching Management System (ICMS). COA has been installed in Sonpur Control and all board are inter connected since 21.11.09. Computerized charting and their print is being obtained from the system.

4.6 ESTABLISHMENT (OPERATING):

    Action Plan:

a)100% counselling of staff.

b)100% Validation of SWR

c)Inspection by Signal Sighting Committee as per schedule.

d)Vacancy position of Safety categories staff in transportation are to be fulfilled     be opening of new station & manning of unmanned gates to fulfillment of staff should be done.

At present vacancy position is as under:

Category

(Group C)

Sanctioned

Strength

Actual

Strength

Vacancy

% age

Safety Category

1631

1275

356

(-) 21.8

Non-Safety Category

278

265

13

(-) 04.7

Total

1909

1540

369

(-) 19.3

4.7 SECTIONAL LINE CAPACITY UTILIZATION FOR

YEAR 2011-12:

Section

Charted

Capacity each way on

31st March

Average

Train services

each way

daily peak period

% age Utilization charted capacity

With

out MB

With MB

With Out MB

With

MB

Chapra – Sonpur/DL

50

42

42.50

85.00

101.19

Sonpur – Hajipur/ /SL

37

31

45.50

122.97

146.77

Hajipur – Ramdayalu Nagar /SL

30

25

33.50

111.60

134.00

Ramdayalu Nagar-Muzaffarpur/DL

52

44

32.50

64.42

76.13

Muzaffarpur – Samastipur /DL

52

44

35.50

68.26

80.68

Samastipur – Bachhwara /DL

51

43

32.50

63.72

75.58

Bachhwara – Barauni /DL

51

43

50.50

99.01

117.44

Barauni – Khagaria/DL

50

42

33.00

66.00

78.57

Khagaria - Mansi/DL

50

42

44.00

88.00

104.76

Mansi – GauchhariAI/DL

50

42

32.50

65.00

77.38

Gauchhari – Narayanpur/SL

26

22

32.50

125.00

147.73

Naughachia – Katareah/DL

50

42

32.50

65.00

77.38

Katareah – Karagola Road/SL

25

21

32.50

130.00

154.76

Karagola Road – Katihar /DL

50

42

32.50

65.00

77.38

Hajipur – Bachhwara /SL

22

18

20.50

93.18

113.89

Barauni – Semaria /TSL

50

42

39.00

78.00

92.85

4.8 OPERATING PERFORMANCES DURING THE YEAR 2010-11, 2011-12 & 2012-13(Up to Feb.):

Items

Target

Actual

Variation

2012-13

2010-11

2011-12

2011-12 (Up to Feb.)

2012-13 (Up to Feb.)

Last year

1.

Loading (in 8-wh)

i)

POL

--

32301

26283

23668

26885

+ 13.6

ii)

Others

--

10974

10464

9881

15211

+ 53.9

iii)

Total

--

43275

36747

33549

42096

+ 25.5

2.

Loading (in MT)

i)

POL

--

1.661

1.353

1.220

1.379

+ 13.0

ii)

Others

--

0.684

0.653

0.616

0.943

+ 53.1

iii)

Total

--

2.345

2.006

1.836

2.322

+ 26.5

3.

No. of Goods Train Interchange

i)

At CI

--

8050

8129

7404

7107

- 04.0

ii)

At SAE

--

5752

5859

5324

5007

- 06.0

iii)

At KIR

--

7728

8451

7636

7803

+ 02.2

iv)

At KVC

--

4820

4843

4431

4345

- 01.9

v)

At SPJ

--

4414

4090

3691

3283

- 11.1

vi)

At MNE

--

681

1008

899

790

- 12.1

vii)

At KGG

--

3268

3044

2732

2426

- 11.2

viii)

Total

--

34746

35484

32117

30758

- 04.2

4.

No. of Wagon Interchange

i)

At CI

--

342948

341827

311293

303810

- 02.4

ii)

At SAE

--

266452

271671

247517

226141

- 08.6

iii)

At KIR

--

327799

352432

318152

332494

+ 04.5

iv)

At KVC

--

216530

219424

198718

199459

+ 00.4

v)

At SPJ

--

188912

177015

159843

142819

- 10.7

vi)

At MNE

--

28358

42450

37701

33391

- 11.4

vii)

At KGG

--

140190

131310

117960

106364

- 09.8

viii)

Total

--

1510899

1536129

1391184

1338365

- 03.8

5.

Diesel Utilization  (In Km)

--

415

410

412

415

+ 00.6

6.

Diesel Outage

--

31.2

36.2

35.7

36.5

+ 02.2

7.

WTR (in day)

--

1.15

1.45

1.44

1.40

- 02.6

8.

Wagon Holding

--

1876

2318

2265

2168

- 04.3

9.

Total no. of Inward (Rake & terminal Detention)

ii)

No. of Rakes

--

2153

1991

1811



ii)

No. of Wagons

--

92458

77342

76554



iii)

A/ Detn (In hrs)

20

27

30

30



10.

Punctuality

a)

Mail/Express

i)

MR Trains

90

45.0

63.4

63.8

68.0

+ 04.2

ii)

Excld.MR Trains

90

54.4

69.1

69.0

81.6

+ 12.6

iii)

Incld.MR Trains

90

51.2

67.2

67.1

70.3

+ 03.2

b)

Pass. Trains

90

90.7

91.7

91.9

33.8

- 58.1

c)

Over-all Trains

90

68.7

77.7

77.7

55.0

- 22.7




Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 12-03-2013  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.