QUICK LINKS
Engineering



BRIEF DESCRIPTIONS OF ENGINEERING DEPTT.

 LEVEL CROSSING GATES:

Engineering

234

Manned

106

Unmanned

128

Traffic

80

Manned

72

Unmanned

8

Class

Traffic

Special Class

01

‘A’ Class

08

‘B’ Class

31

‘C’ Class ( Manned)

32

‘C’ Class (Unmanned)

02

‘D’ Class

06

TOTAL

80

TRACK:

ROUTE KILOMETERS:

Item

Electrified

Non-Electrified

Total

Single Line

38.05

294.741

332.791

Double Line

448.25

-

448.25

Total

486.30

294.741

781.841

ROUTE KILOMETER GROUP WISE:

Sl.

Electrified

Non-Electrified

Total

1.

Group ‘B’

383.60

-

383.60

2.

Group ‘E’

102.70

295.541

398.241

Total Route Kilometers

486.30

295.541

781.841

ASSETS DETAILS:

S.N.

Item

Danapur Division

1.

Track Kilometers

1587.417

1.

Integrated Track Kilometers

2066.635

2.

ETKM

2583.294

2.

Steepest Ruling Gradient

1: 200 (JAJ-KEU )

3.

Sharpest Degree of Curve

Main Line

Branch Line

4.00 deg. (km. 536/7-11)

8.00 deg.

(Km.0/2-7 in Dildarnagar– Tarighat section)

CURVES:

Curve

Main line

Branch line

Total

Up to 1.0º

98

56

154

Up to 2.0º

20

39

59

Up to 3.0º

05

16

21

Up to 4.0º

01

08

09

Above 4.0º

02

05

07

BRIDGE:

Important Bridges

10

Major Bridges

204

Minor Bridges

1209

Road Over Bridges

13

Road Under Bridges

07

Section

Important

Major

Minor

Total

Main line

07

108

477

592

Branch line

03

96

732

831

TOTAL

10

204

1209

1423

  • Comparison of achievement of last 3 years:

 S.N.


Description

Progress during

09-10

10-11

11-12

(up to Oct’11)

1

Track renewal (CTR)

66.31

51.68

37.04

2

Deep screening by machine (Kms)

154.55

50.16

60.21

Manual Deep screening (Kms)

20.35

13.56

1.150

Total Deep screening (Kms)

174.90

63.72

61.36

3

Welding of joints (Nos)

5596

5124

2780

4

Fanshaped T/Outs (Nos)

79

28

31

5

Rehabilitation ofBridges (Nos)

28

24

0

6

Greasing of ERC(Kms.)

529.98

560

263.53

7

Painting of rail corrosion prone area(Kms.)

186

118.7

70.80

8

Manning of LCs(nos.)

0

5*

6

9

Provision of Lifting barriers(nos.)

18

7

2

10

Provision of Hexagonal block on LCs(nos.)

8

13

4

11

Rail fractures (Nos)

70

59

11

Weld failures (Nos)

54

56

08

12

Disposal of scrap (MT)

18488.65

12521.09

4210.583

13

Earning from land (lakhs Rs)

368.07

859.36

564.46

14

Tree plantation (thous')

125.30

150.00

61.5

15

Treatment of leaky roof(m2)

31950.00

44700.00

22500.0

16

Construction of boundary wall (m)

2703.00

1550.00

1865

17

Improvement of circulating area (nos.)

1

2

2

1.Following important works have been completed during 2011-12:

  1. Circulating area of RJPB has been improved.
  1. PF surface has been improved at Bhadaura, Gahmar, Rajendrapul and Chausa (UP).
  1. VIP room has been provided at Danapur
  1. Litti chokha stall has been started on PF no.1 at Patna Jn.
  1. 2nd class Waiting Hall has been improved at Dildarnagar.
  1. 40 nos. Low cost shed over benches on platforms have been provided at Gidhaur- 03 nos., Rajendrapul – 02 nos., Majhauligram – 04 nos., Zamania – 01 no., Pali – 01 no., Darauli – 01 no., Rajgir - 07 nos., Mekra Memrakhabad – 04 nos., Nawadah – 01 no., Rampurdumra – 02 nos., DNR-01no.,Biharsharif - 08 nos., Kiul -02 nos., Dadpur – 01 no., &Pawani Kamarpur -02nos.
  1. Upper class Waiting Hall has been improved at Danapur.
  1. Additional one bay PF shed (PF no.1) has been provided at Ara.
  1. FOB at RGD has been improved by providing chequered tiles on steps & top slab.
  1. 600 m2 of heavy duty mosaic tiles have been provided under PP shelter and other cover area at PF no. 1 at RGD.
  1. Improvement of WENA station has been done by providing 08 nos. PF benches, fencing of PF area and repair of PF coping and other passenger amenity items.
  2. Shallow tube well at JMU has been installed to control water scarcity.
  1. PF surface of UP line has been improved by concreting & heavy duty tile under shaded area at BRYA.
  1. Covering of FOB at Dildarnagar station has been completed.
  1. 04 no.1000 liter capacity syntax tanks have been provided at station building at Rajgir. 

2.Following Passenger amenities works have been completed during 2011-12:

  1. More than 50 years old temple (Hard encroachment) has been removed from the circulating area at Danapur. This has paved the way for development of circulating area which otherwise hardly exist.
  1. 01 no. PSR has been removed in Patna – Gaya section.
  1. Panel Interlocking has been commissioned at TAL on 26.05.2011.
  1. 01 no. Deep Tube Well has been commissioned at Sadisopur.
  1. Tamtam parao and unauthorized hut in north side circulating area at Patna Jn. have been dismantled.
  1. Rs. 564.46283 lakhs has been earned from sundry earning against the annual target of Rs. 700.00 Lakhs.
  1. Manning of 06 nos. Unmanned Level crossing (LC no.47 & 28 in KG section, 17& 48 in BR section and 5 & 6 in PNBE-DDG section) have been done.
  1. Goods shed line no. 3 extended 30m to provide facility to accommodate full rake at JMU.
  1. Goods shed PF no. 3 extended 30m at JMU.
  1. 02 no. last Diamond Xing on wooden layout at KEU has been finally converted into fan shaped layout.
  1. RPF Barrack has been constructed at Buxar & Taregana.
  1. Railway Magistrate office and Hazat (Gents & Ladies) has been improved at KEU.
  1. 15 no. hard encroachments & 60 no. soft encroachments have been removed at km. 540/10 to 538/13 on 01.6.11.
  1. 1865 M Boundary wall has been constructed.

3.Following Track renewal works have been completed during 2011-12:

i.Track renewal=37.043 CTR unit

ii.Deep screening=61.36 kms.

iii.Ballasting=77315 m3

iv.Fanshaped T/O=31 nos.

v.Scrap disposal=4210.58 MT


RAILWAY QUARTERS: 7120

Non Std.

Type–I

Type–II

Type–III

Type–IV

Type–V

Total

300

3858

2363

359

212

29

7120




Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 28-11-2011  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.